Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
scientific article; zbMATH DE number 900396 - MaRDI portal

scientific article; zbMATH DE number 900396

From MaRDI portal
Publication:4884350

zbMath0863.90096MaRDI QIDQ4884350

Wen-Ci Yu

Publication date: 11 July 1996


Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.



Related Items (29)

Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristicExact method for the two-machine flow-shop problem with time delaysThe two-machine no-wait general and proportionate open shop makespan problemPolynomial time algorithms for the UET permutation flowshop problem with time delaysA theoretical development for the total tardiness problem and its application in branch and bound algorithmsOn-line two-machine open shop scheduling with time lagsPolynomial-time approximation schemes for scheduling problems with time lagsScheduling of coupled tasks with unit processing timesApproximating the 2-machine flow shop problem with exact delays taking two valuesOn vanishing of Kronecker coefficientsA note on scheduling coupled tasks for minimum total completion timeCoordinating multi-location production and customer deliveryOn the complexity of open shop scheduling with time lagsMapping filtering streaming applicationsApproximation algorithms for UET scheduling problems with exact delaysOn the reconstruction of binary and permutation matrices under (binary) tomographic constraintsAnalysis of heuristics for the UET two-machine flow shop problem with time delaysMachine scheduling with transportation considerationsMakespan minimization for flow-shop problems with transportation times and a single robotScheduling chains with identical jobs and constant delays on a single machineA 3/2-Approximation for the Proportionate Two-Machine Flow Shop Scheduling with Minimum DelaysMinimizing total completion time in two-machine flow shops with exact delaysOptimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing timesTwo machines flow shop with reentrance and exact time lagTransporting jobs through a two‐machine open shopOn-line two-machine job shop scheduling with time lagsThe single-machine total tardiness scheduling problem: review and extensionsThe two-machine open-shop problem with unit-time operations and time delays to minimize the makespanPermutation flowshop scheduling problems with maximal and minimal time lags




This page was built for publication: