On-line Control Model for Cost-simulation Network Projects
From MaRDI portal
Publication:4887786
DOI10.1057/jors.1996.24zbMath0851.90042OpenAlexW2026698676MaRDI QIDQ4887786
Aharon Gonik, Dimitri Golenko-Ginzburg
Publication date: 25 November 1996
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1996.24
on-line controlchance constraintactivity networkstochastic projectbudget reassignmenthierarchical control model
Related Items (3)
Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach ⋮ A dynamic model for managing overlapped iterative product development ⋮ Timing control points via simulation for production systems under random disturbances
This page was built for publication: On-line Control Model for Cost-simulation Network Projects