Hybrid flowshop scheduling with interstage job transportation
From MaRDI portal
Publication:489104
DOI10.1007/S40305-014-0040-4zbMath1308.90158OpenAlexW2056941025MaRDI QIDQ489104
Publication date: 27 January 2015
Published in: Journal of the Operations Research Society of China (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s40305-014-0040-4
Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items (2)
A two-stage flow shop scheduling problem with transportation considerations ⋮ New complexity results on scheduling problem in a robotic cell
Cites Work
- Unnamed Item
- Unnamed Item
- Scheduling algorithms for flexible flowshops: Worst and average case performance
- Two-machine flowshop scheduling with intermediate transportation under job physical space consideration
- The hybrid flow shop scheduling problem
- Optimal two- and three-stage production schedules with setup times included
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Scheduling Parts in a Combined Production-transportation Work Cell
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage
- Bounds for Certain Multiprocessing Anomalies
- Machine scheduling with transportation considerations
This page was built for publication: Hybrid flowshop scheduling with interstage job transportation