Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

On two-machine flow shop scheduling

From MaRDI portal
Publication:489134
Jump to:navigation, search

DOI10.1007/s40305-014-0055-xzbMath1306.90047OpenAlexW2031058264MaRDI QIDQ489134

Wen-Chang Luo, Guo-Chuan Zhang, Lin Chen

Publication date: 27 January 2015

Published in: Journal of the Operations Research Society of China (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s40305-014-0055-x


zbMATH Keywords

flow shoponline algorithmlinear time


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)




Cites Work

  • Time bounds for selection
  • Two-machine flow-shop scheduling with rejection
  • Optimal two- and three-stage production schedules with setup times included
  • A linear-time approximation algorithm for weighted matchings in graphs
  • Linear Time Approximation Algorithms for Degree Constrained Subgraph Problems
  • Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
  • Unnamed Item


This page was built for publication: On two-machine flow shop scheduling

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:489134&oldid=12369510"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 05:05.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki