scientific article; zbMATH DE number 6167387
From MaRDI portal
Publication:4922000
zbMath1267.90054MaRDI QIDQ4922000
Narges Imanipour, Saeid Nourali, Mohammad Reza Shahriari
Publication date: 28 May 2013
Full work available at URL: http://www.m-hikari.com/ijma/ijma-2012/ijma-41-44-2012/index.html
Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (7)
The third comprehensive survey on scheduling problems with setup times/costs ⋮ A hybrid multi-objective approach for real-time flexible production scheduling and rescheduling under dynamic environment in Industry 4.0 context ⋮ Solving the flexible job shop scheduling problem with sequence-dependent setup times ⋮ Shop scheduling in manufacturing environments: a review ⋮ Integration of Process Planning and Scheduling with Sequence Dependent Setup Time: A Case Study from Electrical Wires and Power Cable Industry ⋮ A worker constrained flexible job shop scheduling problem with sequence-dependent setup times ⋮ Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system
This page was built for publication: