A robust optimization approach to assess the effect of delays in the connection-to-the-grid time of new generation power plants over transmission expansion planning
From MaRDI portal
Publication:492849
DOI10.1007/s10479-015-1833-5zbMath1318.90053OpenAlexW1984167616MaRDI QIDQ492849
Enzo Sauma, Fernando Traub, Jorge R. Vera
Publication date: 21 August 2015
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-015-1833-5
Applications of mathematical programming (90C90) Minimax problems in mathematical programming (90C47) Stochastic programming (90C15)
Related Items (1)
Cites Work
- Unnamed Item
- Computing robust basestock levels
- Robust solutions of uncertain linear programs
- Adjustable robust solutions of uncertain linear programs
- A simulated annealing genetic algorithm for the electrical power districting problem
- A robust optimization approach to wine grape harvesting scheduling
- Stochastic optimization for power system configuration with renewable energy in remote areas
- The Price of Robustness
- Robust Optimization for Power Systems Capacity Expansion under Uncertainty
- Robust Optimization of Large-Scale Systems
- Technical Note—Convex Programming with Set-Inclusive Constraints and Applications to Inexact Linear Programming
- Integer Programming and Combinatorial Optimization
This page was built for publication: A robust optimization approach to assess the effect of delays in the connection-to-the-grid time of new generation power plants over transmission expansion planning