On the choice of baseline schedules for the discrete time/resource trade-off problem under stochastic environment
From MaRDI portal
Publication:4978242
DOI10.1080/10236198.2016.1155566zbMath1372.90057OpenAlexW2332140577MaRDI QIDQ4978242
Jing Xu, Wendi Tian, Zhang-Hua Fu
Publication date: 8 August 2017
Published in: Journal of Difference Equations and Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/10236198.2016.1155566
project schedulingdiscrete time/resource trade-off problemaverage parallel ordersaverage project length
Related Items (1)
Cites Work
- An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem
- Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment
- Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
- Resource-constrained project scheduling: A survey of recent developments.
- A structural design of decision support systems for deteriorating repairable systems.
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Rangen: A random network generator for activity-on-the-node networks
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- A local search method for permutation flow shop scheduling
- Local search methods for the discrete time/resource trade-off problem in project networks
- Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks
- A note on the paper Resource-constraint project scheduling: Notation, classification, models and methods by Bruckner et al
This page was built for publication: On the choice of baseline schedules for the discrete time/resource trade-off problem under stochastic environment