Production rate and lot-size dependent lead time reduction strategies in a supply chain model with stochastic demand, controllable setup cost and trade-credit financing
From MaRDI portal
Publication:5002305
DOI10.1051/RO/2020112zbMath1469.90026OpenAlexW3118240565MaRDI QIDQ5002305
Monami Das Roy, Shib Sankar Sana
Publication date: 27 July 2021
Published in: RAIRO - Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1051/ro/2020112
inventorysupply chainstochastic demandlead timevariable production ratesetup cost reductiontrade-credit
Related Items (2)
Retailer's optimal strategy for a perishable product with increasing demand under various payment schemes ⋮ The impact of system deterioration and product warranty on optimal lot sizing with maintenance and shortages backordered
This page was built for publication: Production rate and lot-size dependent lead time reduction strategies in a supply chain model with stochastic demand, controllable setup cost and trade-credit financing