Monitoring Change Points by a Sign Change Method
From MaRDI portal
Publication:5015925
DOI10.1007/978-3-030-49728-6_10zbMath1475.62285OpenAlexW3047251082MaRDI QIDQ5015925
Publication date: 10 December 2021
Published in: Studies in Computational Intelligence (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-030-49728-6_10
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Multivariate control charts based on the James-Stein estimator
- Comparison of \(p\) control charts for low defective rate
- Distribution-free cumulative sum control charts using bootstrap-based control limits
- Multivariate Generalizations of Cumulative Sum Quality-Control Schemes
- Ridge Regression and James-Stein Estimation: Review and Comments
- A Multivariate Exponentially Weighted Moving Average Control Chart
- Empirical Bayes on vector observations: An extension of Stein's method
- Admissibility of Estimators of the Mean Vector of a Multivariate Normal Distribution with Quadratic Loss
This page was built for publication: Monitoring Change Points by a Sign Change Method