Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm

From MaRDI portal
Publication:5058828
Jump to:navigation, search

DOI10.1080/0305215X.2018.1429601OpenAlexW2794162314MaRDI QIDQ5058828

Peter J. Stuckey, Michelle Blom, Adrian R. Pearce

Publication date: 23 December 2022

Published in: Engineering Optimization (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/0305215x.2018.1429601


zbMATH Keywords

mixed-integer programminghierarchical decompositionshort-term open-pit production scheduling


Mathematics Subject Classification ID

Operations research, mathematical programming (90-XX)


Related Items (1)

Optimization of open-pit mine design and production planning with an improved floating cone algorithm




Cites Work

  • Unnamed Item
  • Unnamed Item
  • Optimization-based heuristics for underground mine scheduling
  • A sliding time window heuristic for open pit mine block sequencing
  • A mixed-integer optimization strategy for oil supply in distribution complexes
  • Receding horizon control applied to optimal mine planning
  • Receding Horizon Control




This page was built for publication: Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:5058828&oldid=19545342"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 8 February 2024, at 11:46.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki