A planning approach for polymetallic mines using a sublevel stoping technique with pillars and ultimate stope limits
From MaRDI portal
Publication:5059365
DOI10.1080/0305215X.2019.1624739OpenAlexW2953920677WikidataQ127568009 ScholiaQ127568009MaRDI QIDQ5059365
Unnamed Author, Mustafa Kumral
Publication date: 23 December 2022
Published in: Engineering Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/0305215x.2019.1624739
heuristicsmixed-integer programmingstope layout planningsublevel stoping with pillarsultimate stope limits
Uses Software
This page was built for publication: A planning approach for polymetallic mines using a sublevel stoping technique with pillars and ultimate stope limits