A double exponentially weighted moving average chart for time between events
From MaRDI portal
Publication:5083894
DOI10.1080/03610918.2018.1532516zbMath1489.62384OpenAlexW2911371235MaRDI QIDQ5083894
Vasileios Alevizakos, Christos Koukouvinos
Publication date: 21 June 2022
Published in: Communications in Statistics - Simulation and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610918.2018.1532516
Related Items
Modified EWMA and DEWMA control charts for process monitoring, A one-sided exponentially weighted moving average control chart for time between events, Modified one-sided EWMA charts for monitoring time between events
Cites Work
- Unnamed Item
- An EWMA chart for monitoring the process standard deviation when parameters are estimated
- A generally weighted moving average chart for time between events
- An Evaluation of the Double Exponentially Weighted Moving Average Control Chart
- Counted Data CUSUM's
- Average Run Lengths for CUSUM Schemes When Observations Are Exponentially Distributed
- A double exponentially weigiited moving average control procedure with variable sampling intervals
- Poisson DEWMA Control Chart
- Cumulative quantity control charts for monitoring production processes
- A control chart for the Gamma distribution as a model of time between events