Two-machine routing open shop on a tree: instance reduction and efficiently solvable subclass
From MaRDI portal
Publication:5085264
DOI10.1080/10556788.2020.1734802zbMath1492.90054arXiv1911.00236OpenAlexW3098577567WikidataQ115005274 ScholiaQ115005274MaRDI QIDQ5085264
Ekaterina Lgotina, I. D. Chernykh
Publication date: 27 June 2022
Published in: Optimization Methods and Software (Search for Journal in Brave)
Full work available at URL: https://arxiv.org/abs/1911.00236
schedulinginstance reductionrouting open shopoverloaded edgeoverloaded nodepolynomially solvable subclassstandard lower boundopen shop with delays
Related Items (3)
Approximation algorithms for two-machine proportionate routing open shop on a tree ⋮ Irreducible bin packing and normality in routing open shop ⋮ Two-machine routing open shop: How long is the optimal makespan?
Cites Work
- Unnamed Item
- Complexity results for flow-shop and open-shop scheduling problems with transportation delays
- The museum visitor routing problem
- A heuristic for the two-machine open-shop scheduling problem with transportation times
- A \(\frac 6 5\)-approximation algorithm for the two-machine routing open-shop problem on a two-node network
- Two-machine shop scheduling problems with batch processing
- When difference in machine loads leads to efficient scheduling in open shops
- Routing open shop with two nodes, unit processing times and equal number of jobs and machines
- The routing open-shop problem on a network: complexity and approximation
- An algorithm with parameterized complexity of constructing the optimal schedule for the routing open shop problem with unit execution times
- Routing Open Shop with Unrelated Travel Times
- The 2-Machine Routing Open Shop on a Triangular Transportation Network
- Transporting jobs through a two‐machine open shop
- Open Shop Scheduling to Minimize Finish Time
- Routing Two-Machine Flowshop Problems on Networks with Special Structure
- Short Shop Schedules
- A Simple Heuristic for m-Machine Flow-Shop and its Applications in Routing-Scheduling Problems
- O(log m)-approximation for the routing open shop problem
- On the routing open shop problem with two machines on a two-vertex network
- Completing Partial Schedules for Open Shop with Unit Processing Times and Routing
This page was built for publication: Two-machine routing open shop on a tree: instance reduction and efficiently solvable subclass