On a routing Open Shop Problem on two nodes with unit processing times
From MaRDI portal
Publication:5090158
DOI10.33048/daio.2020.27.681zbMath1493.90064OpenAlexW4248956709MaRDI QIDQ5090158
Mikhail Golovachev, Artem V. Pyatkin
Publication date: 15 July 2022
Published in: Diskretnyi analiz i issledovanie operatsii (Search for Journal in Brave)
Full work available at URL: http://mathnet.ru/eng/da956
Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Unnamed Item
- Complexity results for flow-shop and open-shop scheduling problems with transportation delays
- Edge-coloring bipartite multigraphs in \(O(E \log D)\) time
- A heuristic for the two-machine open-shop scheduling problem with transportation times
- A polynomial algorithm for the \([n/m/0,\;t_{ij}=1,\text{ tree}/C_{\max}\) open shop problem]
- A \(\frac 6 5\)-approximation algorithm for the two-machine routing open-shop problem on a two-node network
- Routing open shop with two nodes, unit processing times and equal number of jobs and machines
- The routing open-shop problem on a network: complexity and approximation
- An algorithm with parameterized complexity of constructing the optimal schedule for the routing open shop problem with unit execution times
- Transporting jobs through a two‐machine open shop
- Open Shop Scheduling to Minimize Finish Time
- Short Shop Schedules
- On the routing open shop problem with two machines on a two-vertex network
- The open shop problem with routing at a two-node network and allowed preemption
- Completing Partial Schedules for Open Shop with Unit Processing Times and Routing