On the improvement of one-sidedScontrol charts
From MaRDI portal
Publication:5124964
DOI10.1080/02664763.2011.570320OpenAlexW2015442836MaRDI QIDQ5124964
Athanasios C. Rakitzis, Demetrios L. Antzoulakos
Publication date: 30 September 2020
Published in: Journal of Applied Statistics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/02664763.2011.570320
runs rulesadjusted average time to signalsample standard deviationadaptive control chartsprocess variationShewhart control charts
Related Items (3)
A control chart for monitoring process variation using multiple dependent state sampling ⋮ A newS2control chart using repetitive sampling ⋮ Control charts with switching and sensitizing runs rules for monitoring process variation
Cites Work
- Hotelling's \(T^2\) control chart with double warning lines
- Adaptive sampling enhancement for Hotelling's \(T^{2}\) charts
- -Chart with runs and variable sampling intervals
- ARL-Design ofSCharts withk-of-kRuns Rules
- Exact Results for Shewhart Control Charts with Supplementary Runs Rules
- Improved switching rules in control procedures using variable sampling intervals
- The switching behavior of charts with variable sampling intervals
- Guidelines for the application of adaptive control charting schemes
- GENERALIZED VARIANCE CHART DESIGN WITH ADAPTIVE SAMPLE SIZES. THE BIVARIATE CASE
- The performance of control charts for monitoring process variation
- Runs rules schemes for monitoring process variability
- The ModifiedrOut ofmControl Chart
- An approach to the probability distribution of cusum run length
This page was built for publication: On the improvement of one-sidedScontrol charts