Scheduling with time-changing effects and rate-modifying activities
From MaRDI portal
Publication:512804
DOI10.1007/978-3-319-39574-6zbMath1357.90003OpenAlexW2538372929MaRDI QIDQ512804
Kabir Rustogi, Vitaly A. Strusevich
Publication date: 2 March 2017
Published in: International Series in Operations Research \& Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-319-39574-6
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20) Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02)
Related Items (21)
Slack Due-Window Assignment Scheduling Problem with Deterioration Effects and a Deteriorating Maintenance Activity ⋮ Scheduling problems with a weight-modifying-activity ⋮ Single machine scheduling problem with batch setups involving positional deterioration effects and multiple rate-modifying activities ⋮ Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches ⋮ Minimizing total weighted late work on a single-machine with non-availability intervals ⋮ Parallel-machine scheduling of jobs with mixed job-, machine- and position-dependent processing times ⋮ Single machine scheduling with non-availability interval and optional job rejection ⋮ Single-machine scheduling of proportional-linearly deteriorating jobs with positional due indices ⋮ Minimizing tardiness scheduling measures with generalized due-dates and a maintenance activity ⋮ Optimization of scheduling problems with deterioration effects and an optional maintenance activity ⋮ Refined conditions for V-shaped optimal sequencing on a single machine to minimize total completion time under combined effects ⋮ New results for an open time-dependent scheduling problem ⋮ Scheduling jobs with a V-shaped time-dependent processing time ⋮ Solution methods for scheduling problems with sequence-dependent deterioration and maintenance events ⋮ Preemptive Scheduling of Jobs with a Learning Effect on Two Parallel Machines ⋮ Minimizing total late work on a single machine with generalized due-dates ⋮ ND-agent scheduling of linear-deteriorating tasks with positional due indices to minimize total completion time and maximum cost ⋮ A review of four decades of time-dependent scheduling: main results, new topics, and open problems ⋮ Single-machine scheduling problems with general truncated sum-of-actual-processing-time-based learning effect ⋮ A unified analysis for scheduling problems with variable processing times ⋮ Parallel-machine scheduling with job-dependent cumulative deterioration effect and rejection
This page was built for publication: Scheduling with time-changing effects and rate-modifying activities