Method of rescheduling for hybrid production lines with intermediate buffers
From MaRDI portal
Publication:5150030
DOI10.24425/acs.2020.133498zbMath1457.90071OpenAlexW4384935629MaRDI QIDQ5150030
Publication date: 9 February 2021
Published in: Archives of Control Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.24425/acs.2020.133498
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Problem solving in the context of artificial intelligence (heuristics, search strategies, etc.) (68T20)
Uses Software
Cites Work
- Hybrid flowshop scheduling with machine and resource-dependent processing times
- The hybrid flow shop scheduling problem
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- Rescheduling manufacturing systems: A framework of strategies, policies, and methods
- Mixed-Integer Programming Models for Flowshop Scheduling Problems Minimizing the Total Earliness and Tardiness
- Planning and Scheduling in Manufacturing and Services
- Handbook of Approximation Algorithms and Metaheuristics
- Unnamed Item
- Unnamed Item