The integrated cutting and packing heterogeneous precast beams multiperiod production planning problem
From MaRDI portal
Publication:5158322
DOI10.1051/RO/2021107zbMath1479.90172arXiv2008.11303OpenAlexW3195984212MaRDI QIDQ5158322
Tibérius de Oliveira e Bonates, Kennedy Anderson Gumarães de Araújo, Bruno de Athayde Prata
Publication date: 21 October 2021
Published in: RAIRO - Operations Research (Search for Journal in Brave)
Full work available at URL: https://arxiv.org/abs/2008.11303
Applications of statistics in engineering and industry; control charts (62P30) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30) Combinatorial optimization (90C27)
Related Items (2)
Optimization of the cutting process integrated to the lot sizing in multi-plant paper production industries ⋮ Just‐in‐time scheduling problem with due windows and release dates for precast bridge girders
This page was built for publication: The integrated cutting and packing heterogeneous precast beams multiperiod production planning problem