Solution Strategy of Integrated Optimization of Production Planning and Scheduling in a Flexible Job-shop
From MaRDI portal
Publication:5165874
DOI10.3724/SP.J.1004.2013.01476zbMath1299.90124OpenAlexW2331272364MaRDI QIDQ5165874
Publication date: 30 June 2014
Published in: Acta Automatica Sinica (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3724/sp.j.1004.2013.01476
Related Items (2)
An optimization algorithm for integrated remanufacturing production planning and scheduling system ⋮ Integration of production planning and scheduling based on RTN representation under uncertainties
This page was built for publication: Solution Strategy of Integrated Optimization of Production Planning and Scheduling in a Flexible Job-shop