Modeling the Material Allocation System for TFT-LCD Module Factories Based on Make-to-Stock Production
DOI10.1142/S021759591450047XzbMath1307.90086OpenAlexW2156523850MaRDI QIDQ5174417
Jia-Rong Kang, Shu-Hsing Chung, Chun-Cheng Lin
Publication date: 17 February 2015
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s021759591450047x
material allocationdowngraded productlower bound of non-dot-defect ratequality qualification ratethin flim transistor liquid crystal display (TFT-LCD)
Integer programming (90C10) Management decision making, including multiple objectives (90B50) Transportation, logistics and supply chain management (90B06) Inventory, storage, reservoirs (90B05)
Cites Work
- A resource portfolio model for equipment investment and allocation of semiconductor testing industry
- A shadow-price based heuristic for capacity planning of TFT-LCD manufacturing
- SUPPLIER PRODUCTIVITY AND QUALITY PERFORMANCE EVALUATION IN THE TFT-LCD INDUSTRY
- A rework-based dispatching algorithm for module process in TFT-LCD manufacture
- Scheduling with product family set-up times: an application in TFT LCD manufacturing
This page was built for publication: Modeling the Material Allocation System for TFT-LCD Module Factories Based on Make-to-Stock Production