Scheduling steel plates on a roller furnace
From MaRDI portal
Publication:5176336
DOI10.1007/978-3-642-29210-1_62zbMath1306.90083OpenAlexW134510312MaRDI QIDQ5176336
Publication date: 3 March 2015
Published in: Operations Research Proceedings (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-642-29210-1_62
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Case-oriented studies in operations research (90B90)
Cites Work
- Event-based MILP models for resource-constrained project scheduling problems
- Comparing efficiencies of genetic crossover operators for one machine total weighted tardiness problem
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Principles of Sequencing and Scheduling
- Scheduling
- Introduction to evolutionary computing
This page was built for publication: Scheduling steel plates on a roller furnace