Mid-Term Model-Plant Allocation for Flexible Production Networks in the Automotive Industry
From MaRDI portal
Publication:5176343
DOI10.1007/978-3-642-29210-1_69zbMath1306.90089OpenAlexW11545361MaRDI QIDQ5176343
Achim Koberstein, Kai Wittek, Thomas Stefan Spengler
Publication date: 3 March 2015
Published in: Operations Research Proceedings (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-642-29210-1_69
Production models (90B30) Case-oriented studies in operations research (90B90) Discrete location and assignment (90B80)
Cites Work
- Modeling and optimizing of strategic and tactical production planning in the automotive industry under uncertainty
- Strategic network planning for an international automotive manufacturer
- Optimal planning in large multi-site production networks
- Supply chain planning in the German automotive industry
- Principles on the Benefits of Manufacturing Process Flexibility
- Tactical Planning in Flexible Production Networks in the Automotive Industry
- Production Planning by Mixed Integer Programming
This page was built for publication: Mid-Term Model-Plant Allocation for Flexible Production Networks in the Automotive Industry