Synchronized Two-Stage Lot Sizing and Scheduling Problem in Automotive Industry
From MaRDI portal
Publication:5176352
DOI10.1007/978-3-642-29210-1_76zbMath1306.90088OpenAlexW2162730720MaRDI QIDQ5176352
Fadime Üney-Yüksektepe, Rıfat Gürcan Özdemir
Publication date: 3 March 2015
Published in: Operations Research Proceedings (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-642-29210-1_76
Mixed integer programming (90C11) Production models (90B30) Case-oriented studies in operations research (90B90)
This page was built for publication: Synchronized Two-Stage Lot Sizing and Scheduling Problem in Automotive Industry