Scheduling Full-Time and Part-Time Staff to Meet Cyclic Requirements
From MaRDI portal
Publication:5183256
DOI10.1057/jors.1974.7zbMath0274.90019OpenAlexW1989861571MaRDI QIDQ5183256
Publication date: 1974
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1974.7
Numerical mathematical programming methods (65K05) Deterministic scheduling theory in operations research (90B35)
Related Items (4)
Scheduling part-time personnel with availability restrictions and preferences to maximize employee satisfaction ⋮ A resource type analysis of the integrated project scheduling and personnel staffing problem ⋮ Rotating schedules ⋮ An efficient two-phase algorithm for cyclic days-off scheduling.
This page was built for publication: Scheduling Full-Time and Part-Time Staff to Meet Cyclic Requirements