Minimizing maximum tardiness in single FMS machine scheduling with tool changes
From MaRDI portal
Publication:5188152
DOI10.1080/02522667.2009.10699934zbMath1190.90071OpenAlexW2080143563MaRDI QIDQ5188152
Publication date: 10 March 2010
Published in: Journal of Information and Optimization Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/02522667.2009.10699934
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Cites Work
- Unnamed Item
- Unnamed Item
- Scheduling with tool changes to minimize total completion time: Basic results and SPT performance
- Machine scheduling with availability constraints
- Scheduling preemptable tasks on parallel processors with limited availability
- Single-machine scheduling with periodic maintenance and nonresumable jobs.
- Scheduling with limited machine availability
- Machine scheduling with an availability constraint
- Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance
This page was built for publication: Minimizing maximum tardiness in single FMS machine scheduling with tool changes