Algorithms and Computation
From MaRDI portal
Publication:5191659
DOI10.1007/B94771zbMath1205.90125OpenAlexW1769833081MaRDI QIDQ5191659
Hiroshi Nagamochi, Yoshiyuki Karuno
Publication date: 7 August 2009
Published in: Lecture Notes in Computer Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/b94771
Related Items (6)
Exact method for the two-machine flow-shop problem with time delays ⋮ Sequencing optimisation for makespan improvement at wet-etch tools ⋮ Polynomial-time approximation schemes for scheduling problems with time lags ⋮ Flowshop scheduling with interstage job transportation ⋮ Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times ⋮ Two-machine flowshop scheduling problem with coupled-operations
This page was built for publication: Algorithms and Computation