Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Minimizing flow time in a flow-line manufacturing cell with family setup times

From MaRDI portal
Publication:5200787
Jump to:navigation, search

DOI10.1057/palgrave.jors.2601971zbMath1090.90082OpenAlexW2028078907MaRDI QIDQ5200787

Jatinder N. D. Gupta, Jeffrey E. Schaller

Publication date: 11 April 2006

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601971


zbMATH Keywords

lower boundsheuristic algorithmsflowshop schedulingempirical resultsfamily setupsmanufacturing cells


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)


Related Items

Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups ⋮ A comprehensive review of flowshop group scheduling literature ⋮ A survey of scheduling problems with setup times or costs ⋮ Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times



Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:5200787&oldid=19796375"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 8 February 2024, at 18:04.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki