Construction of closed interval for process capability indicesCpu,Cpl, andSpkbased on Boole’s inequality and de Morgan’s laws
From MaRDI portal
Publication:5221562
DOI10.1080/00949655.2016.1182168OpenAlexW2345332276MaRDI QIDQ5221562
Chun-Ming Yang, Chang-Hsien Hsu, Kuen-Suan Chen
Publication date: 1 April 2020
Published in: Journal of Statistical Computation and Simulation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00949655.2016.1182168
Related Items
Cites Work
- Unnamed Item
- Developing a sampling plan by variables inspection for controlling lot fraction of defectives
- Fuzzy nonlinear programming approach for evaluating and ranking process yields with imprecise data
- Supplier selection for one-sided processes with unequal sample sizes
- Production quality and yield assurance for processes with multiple independent characteristics
- Estimation of the process incapability index
- Process capability analysis for an entire product
- Some Process Capability Indices are More Reliable than One Might Think
- Brocess capability with asymmetric tolerances
- Advanced multi-process performance analysis chart for an entire product with joint confidence regions
- Performance measurement for a manufacturing system based on quality, cost and time