A new constraint programming approach for optimising a coal rail system
From MaRDI portal
Publication:523170
DOI10.1007/s11590-016-1041-5zbMath1368.90149OpenAlexW2364323541MaRDI QIDQ523170
Geoff Kent, Erhan Kozan, Mahmoud Masoud, Shi Qiang Liu
Publication date: 20 April 2017
Published in: Optimization Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11590-016-1041-5
Related Items (3)
An efficient heuristic method for joint optimization of train scheduling and stop planning on double-track railway systems ⋮ A real-world mine excavators timetabling methodology in open-pit mining ⋮ A comparative study on three graph-based constructive algorithms for multi-stage scheduling with blocking
Cites Work
- Determining operations affected by delay in predictive train timetables
- Rescheduling rail networks with maintenance disruptions using problem space search
- Optimising a coal rail network under capacity constraints
- A job-shop scheduling approach for optimising sugarcane rail operations
- A column generation approach to train timetabling on a corridor
- Scheduling trains as a blocking parallel-machine job shop scheduling problem
- An external-memory depth-first search algorithm for general grid graphs
- Global constraints for round robin tournament scheduling.
- Energy efficient scheduling of open-pit coal mine trucks
- A mixed integer programming model for long term capacity expansion planning: a case study from the Hunter valley coal chain
- A constraint programming-based approach to the crew scheduling problem of the Taipei mass rapid transit system
- A branch and bound algorithm for scheduling trains in a railway network
- Parallel machine scheduling and common due window assignment with job independent earliness and tardiness costs
- Bicriteria train scheduling for high-speed passenger railroad planning applications
- A constraint programming approach to the multiple-venue, sport-scheduling problem
This page was built for publication: A new constraint programming approach for optimising a coal rail system