The Joint Load Balancing and Parallel Machine Scheduling Problem
From MaRDI portal
Publication:5232864
DOI10.1007/978-3-642-20009-0_79zbMath1421.90064OpenAlexW76114635WikidataQ57514826 ScholiaQ57514826MaRDI QIDQ5232864
Yassine Ouazene, Faicel Hnaien, Lionel Amodeo, Farouk Yalaoui
Publication date: 13 September 2019
Published in: Operations Research Proceedings (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-642-20009-0_79
genetic algorithmmixed integer linear programmingload balancingparallel machine schedulingtotal tardiness
Uses Software
Cites Work
- Unnamed Item
- Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- A workload balancing model for determining set-up time and batch size reductions in GT flow line workcells
- Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach
- The Total Tardiness Problem: Review and Extensions
This page was built for publication: The Joint Load Balancing and Parallel Machine Scheduling Problem