A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem
From MaRDI portal
Publication:5246811
DOI10.1111/itor.12071zbMath1309.90093OpenAlexW1969628616MaRDI QIDQ5246811
Olfa Dridi, Adel Guitouni, Saoussen Krichen
Publication date: 22 April 2015
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1111/itor.12071
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Discrete location and assignment (90B80)
Related Items (3)
A lexicographic approach to the robust resource-constrained project scheduling problem ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Impacts of uncertain project duration and asymmetric risk sensitivity information in project management
Cites Work
- Unnamed Item
- Solving software project scheduling problems with ant colony optimization
- Multi-objectives tabu search based algorithm for progressive resource allocation
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Ant colony optimization for the job rotation scheduling problem
- Differential evolution for solving multi-mode resource-constrained project scheduling problems
- Scheduling subject to resource constraints: Classification and complexity
- A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
- A genetic algorithm for multi-mode resource constrained project scheduling problem
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- An exact algorithm for project scheduling with multiple modes
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- Resource-constrained project scheduling: A survey of recent developments.
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Game theory, maximum entropy, minimum discrepancy and robust Bayesian decision theory
- Solving multi-objective production scheduling problems using metaheuristics
- Hierarchical models for multi-project planning and scheduling
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- Ant colony optimization for the nonlinear resource allocation problem
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- Ant colony optimization theory: a survey
- A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem
- Regional surveillance of disjoint rectangles: a travelling salesman formulation
- Two Approaches to Problems of Resource Allocation among Project Activities -- A Comparative Study
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Resource-constrained project scheduling by simulated annealing
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
- A robust genetic algorithm for resource allocation in project scheduling
- Project scheduling with multiple modes: A genetic algorithm
This page was built for publication: A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem