Rail schedule optimisation in the hunter valley coal chain
From MaRDI portal
Publication:5247704
DOI10.1051/ro/2014049zbMath1310.90016OpenAlexW2025285845MaRDI QIDQ5247704
Andreas T. Ernst, Gaurav Singh, Matthew Baxter, David Sier
Publication date: 27 April 2015
Published in: RAIRO - Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1051/ro/2014049
Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35)
Related Items
Cites Work
- Unnamed Item
- Resource constraint scheduling with a fractional shared resource
- Optimising a coal rail network under capacity constraints
- Railway track allocation: Models and methods
- A column generation approach to the heterogeneous fleet vehicle routing problem
- On the choice of explicit stabilizing terms in column generation
- The volume algorithm: Producing primal solutions with a subgradient method
- A mixed integer programming model for long term capacity expansion planning: a case study from the Hunter valley coal chain
- A Survey of Optimization Models for Train Routing and Scheduling
- Solving a resource allocation problem in wireless mesh networks: A comparison between a CP-based and a classical column generation
- A Genetic Algorithm for Railway Scheduling Problems