Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Phase-I Design Scheme for -chart Based on Posterior Distribution

From MaRDI portal
Publication:5249216
Jump to:navigation, search

DOI10.1080/03610926.2012.752846zbMath1310.62126OpenAlexW2080336851MaRDI QIDQ5249216

Aamir Saghir

Publication date: 29 April 2015

Published in: Communications in Statistics - Theory and Methods (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/03610926.2012.752846


zbMATH Keywords

Bayesian analysisposterior distributioncontrol chartspower curve


Mathematics Subject Classification ID

Point estimation (62F10) Applications of statistics in engineering and industry; control charts (62P30)


Related Items (3)

A EWMA control chart based on an auxiliary variable and repetitive sampling for monitoring process location ⋮ Unnamed Item ⋮ Phase-I design structure of Bayesian variance chart



Cites Work

  • Unnamed Item
  • A new Bayesian approach to quality control charts
  • Optimum Tolerance Regions and Power When Sampling From Some Non-Normal Universes
  • Control Charts for the Generalized Variance Based on Its Predictive Distribution
  • ON THE EVALUATION OF CONTROL CHART LIMITS BASED ON PREDICTIVE DISTRIBUTIONS
  • A Bayesian Approach to Quality Control


This page was built for publication: Phase-I Design Scheme for -chart Based on Posterior Distribution

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:5249216&oldid=19878821"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 8 February 2024, at 19:31.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki