The open shop problem with routing at a two-node network and allowed preemption
From MaRDI portal
Publication:5263775
DOI10.1134/S199047891203009XzbMath1324.90020OpenAlexW2041992105MaRDI QIDQ5263775
I. D. Chernykh, Artem V. Pyatkin
Publication date: 17 July 2015
Published in: Journal of Applied and Industrial Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1134/s199047891203009x
Programming involving graphs or networks (90C35) Transportation, logistics and supply chain management (90B06)
Related Items (5)
Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches ⋮ On a routing Open Shop Problem on two nodes with unit processing times ⋮ Four decades of research on the open-shop scheduling problem to minimize the makespan ⋮ Irreducible bin packing and normality in routing open shop ⋮ Completing Partial Schedules for Open Shop with Unit Processing Times and Routing
This page was built for publication: The open shop problem with routing at a two-node network and allowed preemption