scientific article; zbMATH DE number 279273
From MaRDI portal
Publication:5289267
zbMath0774.90046MaRDI QIDQ5289267
Patrick Esquirol, Jacques Erschler, Pierre Lopez
Publication date: 22 August 1993
Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Related Items (17)
Constraint programming and operations research ⋮ Hybrid flow-shop: a memetic algorithm using constraint-based scheduling for efficient search ⋮ Computing redundant resources for the resource constrained project scheduling problem ⋮ Optimal scheduling of a two-stage hybrid flow shop ⋮ Energetic reasoning and bin-packing problem, for bounding a parallel machine scheduling problem ⋮ Lower bounds for the event scheduling problem with consumption and production of resources ⋮ On linear lower bounds for the resource constrained project scheduling problem. ⋮ Scheduling jobs on parallel machines to minimize a regular step total cost function ⋮ An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the resource constrained project scheduling problem ⋮ A new constraint programming approach for the orthogonal packing problem ⋮ A branch-and-check algorithm for minimizing the weighted number of late jobs on a single machine with release dates ⋮ Two-stage hybrid flow shop with precedence constraints and parallel machines at second stage ⋮ Global propagation of side constraints for solving over-constrained problems ⋮ Optimal parallel machines scheduling with availability constraints ⋮ A Branch-and-Bound method for solving Multi-Skill Project Scheduling Problem ⋮ Cut generation for an integrated employee timetabling and production scheduling problem ⋮ Constraint propagation techniques for the disjunctive scheduling problem
This page was built for publication: