USE OF THE PAR(p) MODEL IN THE STOCHASTIC DUAL DYNAMIC PROGRAMMING OPTIMIZATION SCHEME USED IN THE OPERATION PLANNING OF THE BRAZILIAN HYDROPOWER SYSTEM
From MaRDI portal
Publication:5291234
DOI10.1017/S0269964806060098zbMath1124.90017MaRDI QIDQ5291234
Jorge MacHado Damázio, Maria Elvira P. Maceira
Publication date: 9 May 2006
Published in: Probability in the Engineering and Informational Sciences (Search for Journal in Brave)
Applications of mathematical programming (90C90) Stochastic programming (90C15) Case-oriented studies in operations research (90B90)
Related Items (6)
Spatio-temporal hydro forecasting of multireservoir inflows for hydro-thermal scheduling ⋮ Dynamic sampling algorithms for multi-stage stochastic programs with risk aversion ⋮ SDDP for some interstage dependent risk-averse problems and application to hydro-thermal planning ⋮ Regularized Decomposition of High-Dimensional Multistage Stochastic Programs with Markov Uncertainty ⋮ Stochastic decomposition applied to large-scale hydro valleys management ⋮ A hybrid dynamic programming -- Tabu search approach for the long-term hydropower scheduling problem
This page was built for publication: USE OF THE PAR(p) MODEL IN THE STOCHASTIC DUAL DYNAMIC PROGRAMMING OPTIMIZATION SCHEME USED IN THE OPERATION PLANNING OF THE BRAZILIAN HYDROPOWER SYSTEM