A new algorithm for minimizing makespan, Cmax, in blocking flow-shop problem through slowing down the operations
From MaRDI portal
Publication:5292811
DOI10.1057/PALGRAVE.JORS.2602099zbMath1152.90447OpenAlexW2065891797MaRDI QIDQ5292811
Publication date: 25 June 2007
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2602099
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
This page was built for publication: A new algorithm for minimizing makespan, Cmax, in blocking flow-shop problem through slowing down the operations