Determining the optimal lot size for the finite production model with an imperfect rework process of defective items
From MaRDI portal
Publication:5293412
DOI10.1080/02522667.2004.10699596zbMath1117.90311OpenAlexW2326699800MaRDI QIDQ5293412
Dah-Chuan Gong, Singa Wang Chiu
Publication date: 2 July 2007
Published in: Journal of Information and Optimization Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/02522667.2004.10699596
Cites Work
This page was built for publication: Determining the optimal lot size for the finite production model with an imperfect rework process of defective items