Workload Balancing in Multi-stage Production Processes
From MaRDI portal
Publication:5307530
DOI10.1007/11764298_5zbMath1196.90051OpenAlexW1481662477MaRDI QIDQ5307530
Karsten Weihe, Siamak Tazari, Matthias Müller-Hannemann
Publication date: 14 September 2007
Published in: Experimental Algorithms (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/11764298_5
integer linear programmingnetwork flowsworkload balancingprinted circuit board assemblymulti-exchange local search
Analysis of algorithms and problem complexity (68Q25) Integer programming (90C10) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (4)
Hybrid metaheuristics for the accessibility windows assembly line balancing problem level 2 (AWALBP-L2) ⋮ Combining matheuristics and MILP to solve the accessibility windows assembly line balancing problem level 2 (AWALBP-L2) ⋮ Heuristics and simulated annealing procedures for the accessibility windows assembly line problem level 1 (AWALBP-L1) ⋮ A new MILP model for the accessibility windows assembly line balancing problem level 2 (AWALBP-L2)
Uses Software
This page was built for publication: Workload Balancing in Multi-stage Production Processes