METAHEURISTIC APPROACHES FOR THE MULTILEVEL RESOURCE-CONSTRAINED LOT-SIZING PROBLEM WITH SETUP AND LEAD TIMES
From MaRDI portal
Publication:5315988
DOI10.1142/S0217595905000510zbMath1078.90006MaRDI QIDQ5315988
Paulo Morelato França, Regina E. Berretta, Vinicius Amaral Armentano
Publication date: 12 September 2005
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Approximation methods and heuristics in mathematical programming (90C59) Inventory, storage, reservoirs (90B05)
Related Items (6)
Lead time considerations for the multi-level capacitated lot-sizing problem ⋮ Dynamic capacitated lot-sizing problems: a classification and review of solution approaches ⋮ The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model ⋮ Multi-population genetic algorithm to solve the synchronized and integrated two-level lot sizing and scheduling problem ⋮ A hybrid optimization approach for multi-level capacitated lot-sizing problems ⋮ Combining population-based and exact methods for multi-level capacitated lot-sizing problems
Cites Work
- Optimization by Simulated Annealing
- Multilevel capacitated lotsizing complexity and LP-based heuristics
- A heuristic method for lot-sizing in multi-stage systems
- The application of valid inequalities to the multi-stage lot-sizing problem
- Combining simulated annealing with local search heuristics
- Dynamic Version of the Economic Lot Size Model
- Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources
- Echelon stock formulation for multi-stage lot-sizing with component lead times
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- Solving Multi-Item Lot-Sizing Problems Using Strong Cutting Planes
- Heuristics for Multilevel Lot-Sizing with a Bottleneck
- Deterministic Production Planning: Algorithms and Complexity
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- A Heuristic for a Resource-capacitated Multi-stage Lot-sizing Problem with Lead Times
- Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources
This page was built for publication: METAHEURISTIC APPROACHES FOR THE MULTILEVEL RESOURCE-CONSTRAINED LOT-SIZING PROBLEM WITH SETUP AND LEAD TIMES