An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem
From MaRDI portal
Publication:5322091
DOI10.1287/opre.1040.0167zbMath1165.90462OpenAlexW2136502128MaRDI QIDQ5322091
Publication date: 18 July 2009
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/11693/38307
Related Items (10)
Optimising the Slab Yard Planning and Crane Scheduling Problem using a two-stage heuristic ⋮ Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows ⋮ Multi-degree cyclic flow shop robotic cell scheduling problem: ant colony optimization ⋮ A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell ⋮ Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions ⋮ Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm ⋮ Multiple crane scheduling in a batch annealing process with no-delay constraints for machine unloading ⋮ AN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEM ⋮ Scheduling of a single crane in batch annealing process ⋮ Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots
This page was built for publication: An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem