Minimizing Maximum Flow-time on Related Machines
From MaRDI portal
Publication:5351891
DOI10.4230/LIPICS.APPROX-RANDOM.2015.85zbMATH Open1375.90116OpenAlexW2296769330MaRDI QIDQ5351891
Bouke Cloostermans, Nikhil Bansal
Publication date: 31 August 2017
Full work available at URL: https://dblp.uni-trier.de/db/conf/approx/approx2015.html#BansalC15
Deterministic scheduling theory in operations research (90B35) Approximation algorithms (68W25) Online algorithms; streaming algorithms (68W27)
Related Items (3)
Minimizing Maximum (Weighted) Flow-Time on Related and Unrelated Machines โฎ Title not available (Why is that?) โฎ Minimizing maximum (weighted) flow-time on related and unrelated machines
Recommendations
- Title not available (Why is that?) ๐ ๐
- Title not available (Why is that?) ๐ ๐
- Minimizing maximum (weighted) flow-time on related and unrelated machines ๐ ๐
- Minimizing flow time on a constant number of machines with preemption ๐ ๐
- Minimizing maximum flow-time on related machines ๐ ๐
- Minimizing average flow time on related machines ๐ ๐
- Minimizing Flow-Time on Unrelated Machines ๐ ๐
- Minimizing Average Flow Time on Unrelated Machines ๐ ๐
- Better Algorithms for Minimizing Average Flow-Time on Related Machines ๐ ๐
- Minimizing Maximum (Weighted) Flow-Time on Related and Unrelated Machines ๐ ๐
This page was built for publication: Minimizing Maximum Flow-time on Related Machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5351891)