Project scheduling heuristics-based standard PSO for task-resource assignment in heterogeneous grid
From MaRDI portal
Publication:535971
DOI10.1155/2011/589862zbMath1214.90051OpenAlexW1975568929WikidataQ58654327 ScholiaQ58654327MaRDI QIDQ535971
Publication date: 16 May 2011
Published in: Abstract and Applied Analysis (Search for Journal in Brave)
Full work available at URL: https://eudml.org/doc/222957
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Problem solving in the context of artificial intelligence (heuristics, search strategies, etc.) (68T20)
Related Items (6)
A nonlinear multiobjective bilevel model for minimum cost network flow problem in a large-scale construction project ⋮ An efficient particle swarm optimizer with application to man-day project scheduling problems ⋮ Radial basis function neural network based on an improved exponential decreasing inertia weight-particle swarm optimization algorithm for AQI prediction ⋮ Solving university course timetabling problems using constriction particle swarm optimization with local search ⋮ Determination of endometrial carcinoma with gene expression based on optimized Elman neural network ⋮ Simulated annealing-based krill herd algorithm for global optimization
Uses Software
Cites Work
- Optimization by Simulated Annealing
- Novel scheduling strategy for downlink multiuser MIMO system: Particle swarm optimization
- A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- Resource-constrained project scheduling: A survey of recent developments.
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties
- An ACO algorithm for a dynamic regional nurse-scheduling problem in Austria
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times
- Tabu Search—Part I
- Tabu Search—Part II
- A branch and bound algorithm for the generalized assignment problem
- Project scheduling with multiple modes: A comparison of exact algorithms
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
- Collective dynamics of ‘small-world’ networks
- Project scheduling with multiple modes: A genetic algorithm
- Simulated annealing for multi-mode resource-constrained project scheduling
- Unnamed Item
This page was built for publication: Project scheduling heuristics-based standard PSO for task-resource assignment in heterogeneous grid