Integer programming in forestry
From MaRDI portal
Publication:537614
DOI10.1007/s10479-006-0105-9zbMath1213.90026OpenAlexW1987577024MaRDI QIDQ537614
Publication date: 20 May 2011
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-006-0105-9
Applications of mathematical programming (90C90) Integer programming (90C10) History of mathematics in the 20th century (01A60) History of operations research and mathematical programming (90-03)
Related Items (3)
Evolutionary neighborhood discovery algorithm for agricultural routing planning in multiple fields ⋮ Stochastic forestry planning under market and growth uncertainty ⋮ Using mixed integer programming models to synchronously determine production levels and market prices in an integrated market for roundwood and forest biomass
Cites Work
- Improving computational capabilities for addressing volume constraints in forest harvest scheduling problems
- A tabu search approach for solving a difficult forest harvesting machine location problem
- Even-aged restrictions with sub-graph adjacency
- A Problem of Forest Harvesting and Road Building Solved Through Model Strengthening and Lagrangean Relaxation
- Design and Implementation of an Interactive Optimization System for Telephone Network Planning
- A combinatorial auction improves school meals in Chile: a case of OR in developing countries
- A Heuristic System to Solve Mixed Integér Forest Planning Models
- Harvest Scheduling Subject to Maximum Area Restrictions: Exploring Exact Approaches
This page was built for publication: Integer programming in forestry