Integrated heuristics for scheduling multiple order jobs in a complex job shop
From MaRDI portal
Publication:538004
DOI10.1504/IJMHEUR.2010.034204zbMath1213.90119OpenAlexW2082290775MaRDI QIDQ538004
Lars Mönch, Scott J. Mason, Edward A. Pohl, Jagadish Jampani
Publication date: 23 May 2011
Published in: International Journal of Metaheuristics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1504/ijmheur.2010.034204
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (2)
Hybrid algorithms for the earliness–tardiness single-machine multiple orders per job scheduling problem with a common due date ⋮ Grouping genetic algorithms for solving single machine multiple orders per job scheduling problems
This page was built for publication: Integrated heuristics for scheduling multiple order jobs in a complex job shop