A manufacturing cell formation problem with a maximum cell workload constraint
From MaRDI portal
Publication:5382721
DOI10.1093/IMAMAN/DPV027zbMath1473.90064OpenAlexW2276682880MaRDI QIDQ5382721
Massimiliano Caramia, Renato Mari
Publication date: 18 June 2019
Published in: IMA Journal of Management Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1093/imaman/dpv027
Applications of mathematical programming (90C90) Nonlinear programming (90C30) Production models (90B30)
This page was built for publication: A manufacturing cell formation problem with a maximum cell workload constraint