Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Level schedules for mixed-model JIT production lines: characteristics of the largest instances that can be solved optimally - MaRDI portal

Level schedules for mixed-model JIT production lines: characteristics of the largest instances that can be solved optimally

From MaRDI portal
Publication:5385396

DOI10.1080/00207540701223394zbMath1160.90427OpenAlexW2081660128MaRDI QIDQ5385396

John Miltenburg

Publication date: 6 May 2008

Published in: International Journal of Production Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/00207540701223394




Related Items



Cites Work


This page was built for publication: Level schedules for mixed-model JIT production lines: characteristics of the largest instances that can be solved optimally