Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem - MaRDI portal

A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem

From MaRDI portal
Publication:5385459

DOI10.1080/00207540600943985zbMath1160.90357OpenAlexW2047988383MaRDI QIDQ5385459

No author found.

Publication date: 6 May 2008

Published in: International Journal of Production Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/00207540600943985




Related Items (18)

An exact solution method for multi-manned disassembly line design with and/or precedence relationsAn efficient hybrid artificial bee colony algorithm for disassembly line balancing problem with sequence-dependent part removal timesSecond order conic approximation for disassembly line design with joint probabilistic constraintsA hybrid genetic algorithm for sequence-dependent disassembly line balancing problemA sample average approximation method for disassembly line balancing problem under uncertaintyBalancing of two-sided disassembly lines: problem definition, MILP model and genetic algorithm approachA novel constraint programming and simulated annealing for disassembly line balancing problem with and/or precedence and sequence dependent setup timesAn integrated approach for a new flexible multi-product disassembly line balancing problemAn adaptive genetic algorithm-based and AND/OR graph approach for the disassembly line balancing problemA comparative analysis of meta-heuristic methods on disassembly line balancing problem with stochastic timeModels and two-phase bee algorithms for multi-objective U-shaped disassembly line balancing problemEvolutionary many-objective optimization for mixed-model disassembly line balancing with multi-robotic workstationsPerformance of an ant colony optimisation algorithm in dynamic job shop scheduling problemsRobust balancing of transfer lines with blocks of uncertain parallel tasks under fixed cycle time and space restrictionsRobotic disassembly line balancing problem: a mathematical model and ant colony optimization approachType-E disassembly line balancing problem with multi-manned workstationsEvaluation of mixed-model U-line operational designsTactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches



Cites Work


This page was built for publication: A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem