A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
From MaRDI portal
Publication:5385459
DOI10.1080/00207540600943985zbMath1160.90357OpenAlexW2047988383MaRDI QIDQ5385459
No author found.
Publication date: 6 May 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540600943985
Related Items (18)
An exact solution method for multi-manned disassembly line design with and/or precedence relations ⋮ An efficient hybrid artificial bee colony algorithm for disassembly line balancing problem with sequence-dependent part removal times ⋮ Second order conic approximation for disassembly line design with joint probabilistic constraints ⋮ A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem ⋮ A sample average approximation method for disassembly line balancing problem under uncertainty ⋮ Balancing of two-sided disassembly lines: problem definition, MILP model and genetic algorithm approach ⋮ A novel constraint programming and simulated annealing for disassembly line balancing problem with and/or precedence and sequence dependent setup times ⋮ An integrated approach for a new flexible multi-product disassembly line balancing problem ⋮ An adaptive genetic algorithm-based and AND/OR graph approach for the disassembly line balancing problem ⋮ A comparative analysis of meta-heuristic methods on disassembly line balancing problem with stochastic time ⋮ Models and two-phase bee algorithms for multi-objective U-shaped disassembly line balancing problem ⋮ Evolutionary many-objective optimization for mixed-model disassembly line balancing with multi-robotic workstations ⋮ Performance of an ant colony optimisation algorithm in dynamic job shop scheduling problems ⋮ Robust balancing of transfer lines with blocks of uncertain parallel tasks under fixed cycle time and space restrictions ⋮ Robotic disassembly line balancing problem: a mathematical model and ant colony optimization approach ⋮ Type-E disassembly line balancing problem with multi-manned workstations ⋮ Evaluation of mixed-model U-line operational designs ⋮ Tactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches
Cites Work
- An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines
- The mixed-model U-line balancing problem
- Scheduling disassembly
- Disassembly sequencing: A survey
- Disassembly sequence generation: A Petri net based heuristic approach
- Disassembly line in product recovery
- U-OPT: An analysis of exact U-shaped line balancing procedures
- The U-line Line Balancing Problem
This page was built for publication: A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem