Determination of buffer sizes for drum–buffer–rope (DBR)-controlled production systems
From MaRDI portal
Publication:5385511
DOI10.1080/00207540600922948zbMath1160.90465OpenAlexW2028661348MaRDI QIDQ5385511
No author found.
Publication date: 6 May 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540600922948
Cites Work
- Multiproduct Queueing Networks with Deterministic Routing: Decomposition Approach and the Notion of Interference
- Scheduling using drum-buffer-rope in a remanufacturing environment
- Comparing JIT, MRP and TOC, and embedding TOC into MRP
- Constraint time buffer determination model
- Queuing network analysis approach for estimating the sizes of the time buffers in Theory of Constraints-controlled production systems
This page was built for publication: Determination of buffer sizes for drum–buffer–rope (DBR)-controlled production systems