Gap Reduction Techniques for Online Stochastic Project Scheduling
From MaRDI portal
Publication:5387621
DOI10.1007/978-3-540-68155-7_8zbMath1142.90508OpenAlexW2149220482MaRDI QIDQ5387621
Pascal Van Hentenryck, Grégoire Dooms
Publication date: 27 May 2008
Published in: Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-540-68155-7_8
Applications of mathematical programming (90C90) Stochastic programming (90C15) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (2)
Amsaa: A Multistep Anticipatory Algorithm for Online Stochastic Combinatorial Optimization ⋮ An anytime multistep anticipatory algorithm for online stochastic combinatorial optimization
This page was built for publication: Gap Reduction Techniques for Online Stochastic Project Scheduling